塔吊基础设计与施工专项方案编制指南 (天然地基) 插入项目效果图 工程名称: 文件编号:CSCEC5-FAZN-9(项目自拟编号)项目自拟编号) 发布日期: 执行日期: [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)天然地基) 目 录 一、编制说明·······································································································1 1.1 编制依据·······························································································1 1.2 编制人员·······························································································1 1.3 发放范围·······························································································1 二、工程概况·······································································································2 2.1 工程概况·······························································································2 2.2 工程地质及场地周边情况···································································2 三、施工计划·······································································································3 3.1 施工进度计划·······················································································3 3.2 材料与设备计划···················································································3 四、施工管理及作业人员配备和分工·······························································4 4.1 施工管理人员·······················································································4 4.2 专职安全管理人员···············································································4 4.3 特种作业人员·······················································································4 4.4 其他作业人员·······················································································4 五、施工工艺技术·······························································································5 5.1 塔吊技术参数·······················································································5 5.2 塔吊基础设计·······················································································6 5.3 施工方法·······························································································6 六、验收要求·······································································································9 6.1 质量标准与验收···················································································9 6.2 质量控制措施·······················································································9 七、施工保证措施·····························································································11 7.1 安全保证措施·····················································································11 7.2 文明施工措施·····················································································11 7.3 基础监测·····························································································11 八、应急处置措施·····························································································13 I [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)天然地基) 8.1 编制目的·····························································································13 8.2 应急组织机构及职责·········································································13 8.3 应急措施·····························································································13 九、计算书·········································································································15 9.1 地基承载力验算·················································································15 9.2 地基变形计算·····················································································15 9.3 地基稳定性计算·················································································15 9.4 板式或十字基础计算·········································································15 十、相关施工图纸·····························································································16 II [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)天然地基) 一、编制说明 1.1 编制依据 序号 类别 名 称(项目自拟编号)规范如有更新须作相应更改) 1 《混凝土结构设计规范》(项目自拟编号)GB50010-2010) 2 《建筑地基基础设计规范》(项目自拟编号)GB50007-2011) 3 《混凝结构工程施工规范》GB50666-2011 4 《混凝土结构工程施工质量验收规范》GB50204-2015 5 《建筑结构荷载规范》(项目自拟编号)GB50009-2012) 6 7 标准 《建筑机械使用安全技术规程》(项目自拟编号)JGJ33-2012) 规范 《塔式起重机混凝土基础工程技术规程》(项目自拟编号)JGJ/T187-2009) 8 《建筑地基处理技术规范》 (JGJ79_2012)JGJ79_2012) 9 《危险性较大的分部分项工程安全管理规定》住建部令第 37 号 10 关于实施<危险性较大的分部分项工程安全管理规定>有关问题的通知》建 办质〔2018〕31 号 11 …… 12 **工程承包合同 13 **工程施工图纸 14 相关 **工程《岩土工程勘察报告》 15 文件 **工程施工组织设计 16 《**塔式起重机使用说明书》 17 …… 18 验算 **施工安全设施计算软件(项目自拟编号)版本) 软件 1.2 编制人员 序号 编制人 职务 编制时间 1 张三 技术员 2019.1.1 2 …… …… …… 1.3 发放范围 序号 单位 1

docx文档 9-塔吊基础设计与施工专项方案编制指南(天然地基)

技术资料 > 施组方案 > 施工专项方案 > 文档预览
21 页 0 下载 662 浏览 0 评论 0 收藏 3.0分
温馨提示:如果当前文档出现乱码或未能正常浏览,请先下载原文档进行浏览。
9-塔吊基础设计与施工专项方案编制指南(天然地基) 第 1 页 9-塔吊基础设计与施工专项方案编制指南(天然地基) 第 2 页 9-塔吊基础设计与施工专项方案编制指南(天然地基) 第 3 页 9-塔吊基础设计与施工专项方案编制指南(天然地基) 第 4 页 9-塔吊基础设计与施工专项方案编制指南(天然地基) 第 5 页
下载文档到电脑,方便使用
还有 16 页可预览,继续阅读
本文档由 热心网友 2021-10-05 21:36:23上传分享
给文档打分
您好可以输入 255 个字符
doc5的中文名是什么?( 答案:道客屋 )
评论列表
  • 暂时还没有评论,期待您的金玉良言