基坑支护工程专项施工方案编制指南 (桩锚支护) 插入项目效果图 工程名称: 文件编号:CSCEC5-FAZN-6(项目自拟编号)项目自拟编号) 发布日期: 执行日期: [工程名称] 基坑支护工程专项施工方案(项目自拟编号)桩锚支护) 目 录 一、编制说明···································································································1 1.1 编制依据···························································································1 1.2 编制人员···························································································1 1.3 发放范围···························································································1 二、工程概况···································································································2 2.1 基坑概况和特点···············································································2 2.2 施工平面布置···················································································3 2.3 施工要求及技术保证条件·······························································3 三、施工计划···································································································5 3.1 施工进度计划···················································································5 3.2 材料与设备计划···············································································5 四、施工管理及作业人员配备和分工···························································7 4.1 施工管理人员···················································································7 4.2 专职安全管理人员···········································································7 4.3 特种作业人员···················································································7 4.4 其他作业人员···················································································7 五、施工工艺技术···························································································9 5.1 技术参数···························································································9 5.2 施工工艺流程···················································································9 5.3 施工方法···························································································9 5.4 操作要求·························································································11 5.5 检查试验·························································································12 六、验收要求·································································································14 6.1 质量验收内容及标准·····································································14 6.2 验收程序·························································································15 6.3 验收人员·························································································15 I [工程名称] 基坑支护工程专项施工方案(项目自拟编号)桩锚支护) 七、施工保证措施·························································································17 7.1 组织保障措施·················································································17 7.2 技术措施·························································································18 八、应急处置措施·························································································21 8.1 应急组织机构·················································································21 8.2 预案启动条件·················································································21 8.3 应急预案·························································································21 九、相关施工图纸·························································································24 II [工程名称] 基坑支护工程专项施工方案(项目自拟编号)桩锚支护) 一、编制说明 1.1 编制依据 序号 类别 名称(项目自拟编号)规范如有更新须作相应更改) 1 《建筑地基基础工程施工质量验收规范》GB50202-2002 2 《混凝土结构工程施工质量验收规范》GB50204-2015 3 《建筑边坡工程技术规范》GB50330-2013 4 《建筑基坑支护技术规程》JGJ120-2012 5 标准 《工程测量规范》GB50026-2007 6 规范 《建筑基坑工程监测技术规范》GB50497-2009 7 《建筑施工安全检查标准》JGJ59-2011 8 《建筑机械使用安全技术规程》JGJ33-2012 9 《施工现场临时用电安全技术规范》JGJ46-2005 10 …… 11 **工程施工合同文件 12 **工程施工图纸、图纸会审及设计变更等 13 相关 **工程基坑支护设计图纸 14 文件 **工程施工组织设计 15 **工程《岩土工程勘察报告》 16 …… 1.2 编制人员 序号 编制单位 编制人 职务 编制时间 1 **支护公司 张三 技术员 2019.1.1 2 …… …… …… …… 1.3 发放范围 序号 单位 部门 1 公司/分公司 工程管理部、技术质量部、安全部、…… 2 项目部 工程部、技术部、质量部、安全部、…… 3 分包单位 4 …… ……公司、…… …… 1 [工程名称] 基坑支护工程专项施工方案(项目自拟编号)桩锚支护) 二、工程概况 2.1 基坑概况和特点 2.1.1 工程概况 序号 项目 概况 1 工程名称 ***。 2 工程组成 总建筑面积**㎡,由***组成。 3 地理位置 项目位于***市***区,……。 4 基坑形式 基坑面积**m2,呈**形状,周长**m,长**m,宽**m,深**m。 5 周边环境 6 水文情况 叙述周边道路,建筑高度、结构形式、用途、与基坑局里,周边管网等… … 本项目地下水类型为孔隙型潜水,地下水埋深**~**m(高程**~**m),地 下水补给来源为大气降水,地下水位变化幅度约±1.00m。 1、根据周边环境分析,周边管网众多、房屋年代久远等周边环境的影响; 7

docx文档 6-基坑支护工程专项施工方案编制指南(桩锚支护)

技术资料 > 施组方案 > 施工专项方案 > 文档预览
27 页 0 下载 465 浏览 0 评论 0 收藏 3.0分
温馨提示:如果当前文档出现乱码或未能正常浏览,请先下载原文档进行浏览。
6-基坑支护工程专项施工方案编制指南(桩锚支护) 第 1 页 6-基坑支护工程专项施工方案编制指南(桩锚支护) 第 2 页 6-基坑支护工程专项施工方案编制指南(桩锚支护) 第 3 页 6-基坑支护工程专项施工方案编制指南(桩锚支护) 第 4 页 6-基坑支护工程专项施工方案编制指南(桩锚支护) 第 5 页
下载文档到电脑,方便使用
还有 22 页可预览,继续阅读
本文档由 热心网友 2021-10-05 21:36:14上传分享
给文档打分
您好可以输入 255 个字符
doc5的中文名是什么?( 答案:道客屋 )
评论列表
  • 暂时还没有评论,期待您的金玉良言