大体积混凝土专项施工方案编制指南 插入项目效果图 工程名称: 文件编号:CSCEC5-FAZN-8(项目自拟编号)项目自拟编号) 发布日期: 执行日期: [工程概况] 大体积混凝土专项施工方案 目 录 一、编制说明·······································································································1 1.1 编制依据·······························································································1 1.2 编制人员·······························································································1 1.3 发放范围·······························································································1 二、工程概况·······································································································2 2.1 工程总体概况·······················································································2 2.2 大体积混凝土概况···············································································2 2.3 施工平面布置·······················································································3 2.4 施工要求和技术保证条件···································································3 三、施工计划·······································································································5 3.1 施工进度计划·······················································································5 3.2 劳动力配置计划···················································································5 3.3 材料配置计划·······················································································5 4.4 设备配置计划·······················································································5 四、施工管理及作业人员配备和分工·······························································7 4.1 施工管理人员·······················································································7 4.2 专职安全管理人员···············································································7 4.3 特种作业人员·······················································································7 4.4 其他作业人员·······················································································7 五、深化设计·······································································································8 5.1 冷却水管布置·······················································································8 5.2 测温元件布置·······················································································9 5.3 钢筋支架布置·····················································································10 六、施工工艺技术·····························································································12 6.1 技术参数·····························································································12 6.2 施工工艺流程·····················································································12 I [工程概况] 大体积混凝土专项施工方案 6.3 施工方法·····························································································12 6.4 检验试验计划·····················································································17 七、验收要求·····································································································18 7.1 验收标准·····························································································18 7.2 验收程序·····························································································18 7.3 验收内容·····························································································18 7.4 验收人员·····························································································18 八、施工保证措施·····························································································19 8.1 质量保证措施·····················································································19 8.2 安全保证措施·····················································································20 8.3 文明施工保证措施·············································································20 8.4 环境保证措施·····················································································20 8.5 进度保证措施·····················································································21 8.6 应急保障措施·····················································································21 8.7 季节施工保障措施·············································································21 九、计算书·········································································································23 9.1 混凝土泵输出量和所需搅拌运输车数量计算·································23 9.2 大体积混凝土温度应力与收缩应力计算·········································23 9.3 大体积混凝土表面保温层计算·····

docx文档 8-大体积混凝土专项施工方案编制指南

技术资料 > 施组方案 > 施工专项方案 > 文档预览
30 页 1 下载 269 浏览 0 评论 0 收藏 3.0分
温馨提示:如果当前文档出现乱码或未能正常浏览,请先下载原文档进行浏览。
8-大体积混凝土专项施工方案编制指南 第 1 页 8-大体积混凝土专项施工方案编制指南 第 2 页 8-大体积混凝土专项施工方案编制指南 第 3 页 8-大体积混凝土专项施工方案编制指南 第 4 页 8-大体积混凝土专项施工方案编制指南 第 5 页
下载文档到电脑,方便使用
还有 25 页可预览,继续阅读
本文档由 热心网友 2021-10-05 21:36:20上传分享
给文档打分
您好可以输入 255 个字符
doc5的中文名是什么?( 答案:道客屋 )
评论列表
  • 暂时还没有评论,期待您的金玉良言