脚手架工程设计与施工专项方案 编制指南(附着升降式) 插入项目效果图 工程名称: 文件编号:CSCEC5-FAZN-18(项目自拟编号)项目自拟编号) 发布日期: 执行日期: [工程名称] 附着升降式脚手架工程设计与施工专项方案 目 录 一、编制说明·······································································································1 1.1 编制依据·······························································································1 1.2 编制人员·······························································································1 1.3 发放范围·······························································································1 二、工程概况·······································································································2 2.1 工程总体概况·······················································································2 2.2 附着升降脚手架概况和特点·······························································2 2.3 施工平面布置·······················································································3 2.4 使用工况·······························································································4 2.5 施工要求和技术保证条件···································································5 三、施工计划·······································································································6 3.1 施工进度计划·······················································································6 3.2 资源配置计划·······················································································6 四、施工管理及作业人员配备和分工·······························································8 4.1 施工管理人员·······················································································8 4.2 专职安全管理人员···············································································8 4.3 特种作业人员·······················································································8 4.4 其他作业人员·······················································································8 五、施工工艺技术·······························································································9 5.1 技术参数·······························································································9 5.2 工艺流程·······························································································9 5.3 施工方法·······························································································9 5.4 特殊部位工艺节点·············································································10 六、验收要求·····································································································14 6.1 验收标准·····························································································14 6.2 验收程序·····························································································14 I [工程名称] 附着升降式脚手架工程设计与施工专项方案 6.3 验收内容·····························································································15 6.4 验收人员·····························································································17 七、施工保证措施·····························································································18 7.1 技术措施·····························································································18 7.2 监测监控措施·····················································································18 7.3 评估报告·····························································································19 八、应急处置措施·····························································································21 8.1 应急组织机构及职责·········································································21 8.2 危险源辨识与控制措施·····································································21 8.3 应急处置措施·····················································································21 九、计算书·········································································································25 十、相关施工图纸·····························································································26 II 附着升降式脚手架工程设计与施工专项方案 [工程名称] 一、编制说明 1.1 编制依据 序号 类别 1 名 称(项目自拟编号)规范如有更新须作相应更改) 《危险性较大的分部分项工程安全管理规定》住建部令第 37 号 《关于实施<危险性较大的分部分项工程安全管理规定>有关问题的通知》 2 建办质〔2018〕31 号 3 《建筑施工工具式脚手架安全技术规范》JGJ202-2010 4 《建筑施工安全检查标准》JGJ59-2011 5 《建筑施工高处作业安全技术规范》JGJ80-2011 6 7 标准 规范 《建筑机械使用安全技术规范》JGJ33-2012 《施工现场临时用电安全技术规范》JGJ46-2005 8 《钢结构设计规范》GB50017-2003 9 《建筑物防雷设计规范》GB50057-2010 10 《机械设备安装工程施工及验收通用规范》GB50231-2009 11 《建筑施工升降设备设施检验标准》JGJ305-2013 12 …… 13 **工程施工合同 14 相关 **工程施工图纸、图纸会审及设计变更等 15 文件 **
18-附着升降式脚手架工程设计与施工专项方案编制指南
技术资料
>
施组方案
>
施工专项方案
>
文档预览
29 页
0 下载
338 浏览
0 评论
0 收藏
3.0分
温馨提示:如果当前文档出现乱码或未能正常浏览,请先下载原文档进行浏览。
下载文档到电脑,方便使用
下载文档
还有
24
页可预览,
继续阅读
本文档由
热心网友
于
2021-10-05 21:35:16
上传分享
举报
下载
原文档
(3.69 MB)
收藏
分享
给文档打分
您好可以输入
255
个字符
doc5的中文名是什么?( 答案:
道客屋
)
评论列表
暂时还没有评论,期待您的金玉良言
最新文档
中建安全技术交底汇总
中建五局武汉华润葛洲坝琨瑜府(一期)模板施工方案
中建五局框架-核心筒结构高大模板工程专项施工方案
中建五局建筑工程应急预案
中建五局安阳碧桂园天汇铝合金模板专项施工方案
9-塔吊基础设计与施工专项方案编制指南(天然地基)
8-大体积混凝土专项施工方案编制指南
7-基坑支护工程专项施工方案编制指南(土钉墙支护)
6-基坑支护工程专项施工方案编制指南(桩锚支护)
5-高大模板工程设计与施工专项方案编制指南
1
/
29
评价文档
10 个金币
下载文档(3.69 MB)
回到顶部
×
下载提示
文档下载,需要消耗您
10
个金币。
(登录后金币免费得)
您确定要下载
18-附着升降式脚手架工程设计与施工专项方案编制指南
文档吗?
×
分享,让知识传承更久远
×
文档举报
举报原因:
垃圾广告
淫秽色情
虚假中奖
敏感信息
人身攻击
骚扰他人
×
收藏文档
收藏文档
请选择收藏夹
请选择收藏夹
没有合适的收藏夹?去
创建收藏夹