塔吊基础设计与施工专项方案编制指南 (桩基础) 插入项目效果图 工程名称: 文件编号:CSCEC5-FAZN-10(项目自拟编号)项目自拟编号) 发布日期: 执行日期: [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)桩基础) 目 录 一、编制说明·······································································································1 1.1 编制依据·······························································································1 1.2 编制人员·······························································································1 1.3 发放范围·······························································································1 二、工程概况·······································································································2 2.1 工程总体概况·······················································································2 2.2 工程地质及场地周边情况···································································2 2.3 施工平面布置·······················································································3 2.4 施工要求和技术保证条件···································································4 三、施工计划·······································································································5 3.1 施工进度计划·······················································································5 3.2 材料与设备计划···················································································5 四、施工管理及作业人员配备和分工·······························································6 4.1 施工管理人员·······················································································6 4.2 专职安全管理人员···············································································6 4.3 特种作业人员·······················································································6 4.4 其他作业人员·······················································································6 五、施工工艺技术·······························································································7 5.1 技术参数·······························································································7 5.2 塔吊基础设计·······················································································8 5.3 施工方法·····························································································10 六、验收要求·····································································································13 6.1 验收标准·····························································································13 6.2 塔吊基础验收·····················································································14 七、施工保证措施·····························································································16 7.1 安全保证措施·····················································································16 I [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)桩基础) 7.2 文明施工措施·····················································································16 7.3 技术措施·····························································································16 7.4 监测监控措施·····················································································17 八、应急处置措施·····························································································19 8.1 编制目的·····························································································19 8.2 应急组织机构及职责·········································································19 8.3 应急措施·····························································································19 九、计算书·········································································································21 9.1 地基承载力验算·················································································21 9.2 地基变形计算·····················································································21 9.3 地基稳定性计算·················································································21 9.4 桩基础计算·························································································21 9.5 桩基础承台计算·················································································21 十、相关施工图纸·····························································································22 II [工程名称] 塔吊基础设计与施工专项方案(项目自拟编号)桩基础) 一、编制说明 1.1 编制依据 序号 类别 名 称(项目自拟编号)规范如有更新须作相应更改) 1 《混凝土结构设计规范》(项目自拟编号)GB50010-2011) 2 《建筑地基基础设计规范》(项目自拟编号)GB50007-2011) 3 《混凝结构工程施工规范》GB50666-2011 4 《混凝土结构工程施工质量验收规范》GB50204-2015 5 6 《建筑结构荷载规范》(项目自拟编号)GB50009-2012) 标准 规范 《建筑桩基技术规范》(JGJ 94-2008)JGJ 94-2008) 7 《塔式起重机混

docx文档 10-塔吊基础设计与施工专项方案编制指南(桩基础)

技术资料 > 施组方案 > 施工专项方案 > 文档预览
26 页 0 下载 340 浏览 0 评论 0 收藏 3.0分
温馨提示:如果当前文档出现乱码或未能正常浏览,请先下载原文档进行浏览。
10-塔吊基础设计与施工专项方案编制指南(桩基础) 第 1 页 10-塔吊基础设计与施工专项方案编制指南(桩基础) 第 2 页 10-塔吊基础设计与施工专项方案编制指南(桩基础) 第 3 页 10-塔吊基础设计与施工专项方案编制指南(桩基础) 第 4 页 10-塔吊基础设计与施工专项方案编制指南(桩基础) 第 5 页
下载文档到电脑,方便使用
还有 21 页可预览,继续阅读
本文档由 热心网友 2021-10-05 21:34:51上传分享
给文档打分
您好可以输入 255 个字符
doc5的中文名是什么?( 答案:道客屋 )
评论列表
  • 暂时还没有评论,期待您的金玉良言